§ 21.80.110. Table 8: Building Configuration.  


Latest version.
  • This table shows the Configurations for different building heights for each Transect Zone. It must be modified to show actual calibrated heights for local conditions. Recess Expression Lines shall occur on higher buildings as shown. N = maximum height as specified in Table 14k.

    21.80.110.png

    1.

    Building height shall be measured in number of Stories, excluding Attics and raised basements. Height limits also do not apply to masts, belfries, clock towers, chimney flues, water tanks, elevator bulkheads and similar structures.

    2.

    Stories may not exceed 14 feet in height from finished floor to finished floor, except for a first floor Commercial Function, which shall be a minimum of 11 feet and may be a maximum of 25 feet.

    3.

    Height shall be measured from the average Enfronting Sidewalk grade to the uppermost eave of a main pitched roof (not of a dormer), or to the uppermost roof deck (not the top of parapet) of a flat roof.

    (Ord. 16945 § 2 (part), 2008)

(Ord. No. 17542, § 38(Exh. J), 4-26-2011; Ord. No. 17787, § 17(Exh. J), 5-15-2012)