§ 18.02.106.18. Temporary gas permit fee.  


Latest version.
  • A nonrefundable established permit fee is required for each month or portion of a month for which such permit is requested and shall be paid when the application is filed. This shall be separate from and in addition to fees required under Section [18.02.106.17] 18.02.109.6.

(Ord. No. 17749, § A, 3-6-2012, eff. 5-1-2012; Ord. No. 18508 , § 1, 5-31-2016)

Editor's note

Ord. No. 18508 , § 1, adopted May 31, 2016, set out provisions amending and, in effect, renumbering § 18.02.106.18 as 18.02.109.3.11. To maintain the numeric sequencing presented within this chapter, this section has been redesignated as § 18.02.106.18, at the discretion of the editor.