If provider removes or relocates a wireless facility, transport facility, or ground
equipment at its own discretion, it shall notify the city engineer in writing not
less than ten business days prior to removal or relocation. Provider shall obtain
all permits required for relocation or removal of its wireless facilities, transport
facilities, or ground equipment prior to relocation or removal. In the event a streetlight
has been installed on a node support pole, as provided in Section 15.10.340.B. above,
provider will not remove or relocate the node support pole without the city's permission.
(Ord. No.
18717
, § 1, 8-22-2017)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');